Nuclear power
H844 — Replacement of turbogenerator excitation control systems
11/2022 – 11/2023
- Owner
- ČEZ, Temelín Nuclear Power Plant
- Supplier
- ZAT a.s.
- Period of involvement
- 11/2022 – 11/2023
- Role
- Lead Project Engineer
Supply and replacement of turbogenerator excitation control systems at Temelín Nuclear Power Plant, Units 1 and 2, during scheduled outages. Scope included complete engineering and installation documentation and replacement of the existing excitation control systems.
ETE G721 — Replacement of diesel generator excitation control systems
11/2021 – present
- Owner
- ČEZ, Temelín Nuclear Power Plant
- Supplier
- ZAT a.s.
- Period of involvement
- 11/2021 – present
- Role
- Lead Project Engineer
Supply and replacement of diesel generator excitation control systems at Temelín Nuclear Power Plant during scheduled unit outages. Scope included complete engineering and installation documentation and replacement of the existing control systems.
Moisture separator replacement at Temelín Units 1 and 2
01/2018 – 08/2021
- Owner
- ČEZ, Temelín Nuclear Power Plant
- Supplier
- Balcke-Dürr (Germany), G-team (Czech Republic)
- Period of involvement
- 01/2018 – 08/2021
- Role
- Project Delivery Director / Project Manager
Supply and replacement of moisture separators (30 m, 114 t) at Temelín Nuclear Power Plant, Units 1 and 2, during scheduled outages. Detailed planning of the replacement works, detailed engineering and documentation for on-site transport, installation and testing.
Dukovany Nuclear Power Plant, Units 1–4 — replacement of safety and control systems
2001 – 2006
- Owner
- ČEZ
- Supplier
- ŠKODA JS
- Period of involvement
- 2001 – 2006
- Role
- Project Manager / Project Director
Turnkey replacement of safety, control and information systems at Dukovany Nuclear Power Plant, transitioning from analogue to digital control during scheduled outages. Scope included management of subcontractors including Framatome, Rolls-Royce, I&C Energo and ZAT.
I&C modernisation at Dukovany Nuclear Power Plant
10/2007 – 12/2011
- Owner
- ČEZ — Dukovany Nuclear Power Plant
- Supplier
- ZAT (Czech Republic), I&C Energo (Czech Republic), Framatome (France), Rolls-Royce (France)
- Period of involvement
- 10/2007 – 12/2011
- Role
- Contract Manager
Replacement of analogue control systems with digital systems at Dukovany Nuclear Power Plant during scheduled outages. Scope included basic and detailed design, manufacture and installation of new control cabinets, cabling and instrumentation, and unit start-up with the new systems.
Bid for completion of Temelín Nuclear Power Plant, Units 3 and 4
01/2010 – 12/2014
- Owner
- ČEZ
- Supplier
- Suppliers of the electrical and I&C package
- Period of involvement
- 01/2010 – 12/2014
- Role
- Project Manager / Deputy Project Director for Electrical and I&C
Preparation and negotiation of the bid submitted by the ŠKODA JS – Atomstroyexport – OKB Gidropress consortium. Responsibility for the technical and commercial proposal for the electrical and I&C package and leadership of the bid team.
Supply of filtered containment venting systems (FCVS)
03/2017 – 12/2021
- Owner
- NAEK Energoatom, Ukraine
- Supplier
- Promont (Czech Republic), ES Group (Ukraine), Framatome (Germany), JUTEM Engineering (Ukraine)
- Period of involvement
- 03/2017 – 12/2021
- Role
- Project Delivery Director / Project Manager
Post-Fukushima safety upgrades at twelve nuclear units at the Rivne, Zaporizhzhia, South Ukraine and Khmelnytskyi plants in Ukraine. Scope included engineering, component manufacture and supply, installation and welding within the containment enclosure, and as-built documentation.
Engineering support for completion of Mochovce Nuclear Power Plant, Units 3 and 4
01/2015 – 05/2017
- Owner
- Slovenské elektrárne, a.s.
- Supplier
- A network of 40 engineering companies from the Czech Republic and Slovakia
- Period of involvement
- 01/2015 – 05/2017
- Role
- Project Manager
Engineering services to the owner during installation and system handover for commissioning, including management of interfaces between the primary and secondary circuits, functional testing and expert advisory support.
Lungmen Nuclear Power Plant, Taiwan
03/2009 – 11/2015
- Owner
- Taiwan Power Company
- Supplier
- General Electric
- Period of involvement
- 03/2009 – 11/2015
- Role
- Quality Engineer / Deputy Project Team Leader
Development and supply of an automated reactor vessel head nut-tightening tool for GE.
Bid for completion of Belene Nuclear Power Plant, Bulgaria
2005 – 2006
- Owner
- NEK EAD, Bulgaria
- Supplier
- ŠKODA Alliance bid
- Period of involvement
- 2005 – 2006
- Role
- Bid Director for ŠKODA Alliance
Preparation, submission and negotiation of the bid for construction and completion of Belene Nuclear Power Plant in Bulgaria.
Combined-cycle and gas-fired power plants; turbine supply
New 660 MWe unit at Ledvice Power Plant — OB09 flue gas desulphurisation
03/2009 – 11/2015
- Owner
- ČEZ
- Supplier
- Austria Energy & Environment / Andritz
- Period of involvement
- 03/2009 – 11/2015
- Role
- Lead Design Engineer (Civil Works) / Designer's Site Supervision
Construction of a complete flue gas desulphurisation plant for the new generating unit at Ledvice.
Comprehensive refurbishment of Prunéřov II Power Plant, 3 × 250 MW — civil works
04/2011 – 11/2015
- Owner
- ČEZ
- Supplier
- Metrostav
- Period of involvement
- 04/2011 – 11/2015
- Role
- Lead Design Engineer / Designer's Site Supervision
Civil works for the refurbishment of Prunéřov II Power Plant.
PKN Orlen Płock, TG7, 70 MW
12/2015 – 04/2021
- Owner
- PKN Orlen, Poland
- Supplier
- Doosan Škoda Power (EPC)
- Period of involvement
- 12/2015 – 04/2021
- Role
- Lead Project Engineer — Delivery Phase
EPC project for a new TG7 back-pressure steam turbine unit.
Morupule 38 MW, Botswana
01/2016 – 03/2018
- Owner
- Botswana Power Corporation (BPC)
- Supplier
- Doosan Heavy Industries (EPC)
- Period of involvement
- 01/2016 – 03/2018
- Role
- Lead Project Engineer — Delivery Phase
Supply of a 38 MW MTD30 single-casing condensing steam turbine and associated equipment on the existing turbine-generator foundation, including installation supervision and commissioning.
Empalme II CCPP, 300 MW, Mexico
09/2016 – 09/2019
- Owner
- Comisión Federal de Electricidad (CFE)
- Supplier
- DURO Felguera / Elecnor (EPC)
- Period of involvement
- 09/2016 – 09/2019
- Role
- Lead Project Engineer — Delivery Phase
Supply of a 300 MW MTD70 three-casing condensing steam turbine and associated equipment, including a hydrogen-cooled generator, electrical systems and piping, with installation supervision and commissioning.
UK projects — Templeborough, Margam, Dunbar and Teesside
08/2018 – 08/2020
- Owner
- Babcock & Wilcox (USA) and Vølund (Denmark) consortium
- Supplier
- —
- Period of involvement
- 08/2018 – 08/2020
- Role
- Lead Project Engineer — Delivery Phase
Turnkey supply of turbine islands with 32–38 MW condensing turbines for new biomass combustion plants, including mechanical installation, commissioning and warranty services.
Kipas Söke Power Plant, 55 MW, Türkiye
05/2019 – 04/2021
- Owner
- Maren Maraş Electric
- Supplier
- —
- Period of involvement
- 05/2019 – 04/2021
- Role
- Lead Project Engineer — Delivery Phase
Supply of a 55 MW MTD30 single-casing back-pressure steam turbine for a new paper production line in Söke, including installation supervision and commissioning.
Sorek B Seawater Desalination Plant, Israel
08/2020 – 04/2021
- Owner
- State of Israel
- Supplier
- IDE Technologies (EPC)
- Period of involvement
- 08/2020 – 04/2021
- Role
- Lead Project Engineer — Delivery Phase
Supply of three MTD20 single-casing mechanical-drive steam turbine units for driving a pair of high-pressure water pumps.
Green Świecie, 88 MW, Poland
2014 – 2016
- Owner
- Mondi Świecie S.A.
- Supplier
- Doosan Škoda Power
- Period of involvement
- 2014 – 2016
- Role
- Process Engineer / Design Coordinator / Designer's Site Supervision
Expansion of a paper mill with an 88 MW steam turbine-generator set for combined electricity and process steam production, including the condenser, steam piping, electrical systems and control system.
Lisbjerg Biomass Plant, 37 MW, Denmark
2015 – 2017
- Owner
- AffaldVarme Aarhus
- Supplier
- —
- Period of involvement
- 2015 – 2017
- Role
- Process Engineer / Design Coordinator / Designer's Site Supervision
Turnkey delivery of a complete turbine hall for a biomass-fired CHP plant with a 37 MW back-pressure steam turbine, including turbine hall equipment and commissioning.
Asnæs ASV6 Bio, 129 MW — Kalundborg CHP Plant, Denmark
2016 – 2018
- Owner
- Ørsted A/S
- Supplier
- —
- Period of involvement
- 2016 – 2018
- Role
- Process Engineer / Design Coordinator
Turnkey delivery of a complete turbine hall with a 129 MW two-casing steam turbine. The low-pressure section can be disengaged via an SSS clutch for maximum operating flexibility.
Mazidagi Plant, 32 MW, Türkiye (chemical industry)
2016 – 2017
- Owner
- Eti Bakır Co.
- Supplier
- —
- Period of involvement
- 2016 – 2017
- Role
- Process Engineer / Design Coordinator
Delivery of a complete turbine hall, including external cooling pipework, an air-cooled condenser, a high-speed turbine, gearbox and generator.
Curtis, 50 MW, and Cubillos del Sil, 49.5 MW, Spain
04/2018 – 01/2020
- Owner
- Greenalia SA, Forestalia Renovables
- Supplier
- Acciona Industrial, S.A. (EPC)
- Period of involvement
- 04/2018 – 01/2020
- Role
- Lead Project Engineer — Delivery Phase
Supply of condensing steam turbines for two new biomass-fired plants in northern Spain, with provision for future heat export.
EL-TO Zagreb CCPP, 150 MW, Croatia
01/2019 – 01/2020
- Owner
- HEP d.d.
- Supplier
- FATA S.p.A (EPC)
- Period of involvement
- 01/2019 – 01/2020
- Role
- Lead Project Engineer — Delivery Phase
Supply of a 37 MW steam turbine with generator and gearbox for a new combined-cycle plant in Zagreb supplying industrial steam and district heating.
Istanbul CCPP, 450 MW, Türkiye
06/2018 – 12/2020
- Owner
- Istanbul Enerji
- Supplier
- GAMA Power Systems (EPC)
- Period of involvement
- 06/2018 – 12/2020
- Role
- Lead Project Engineer — Delivery Phase
Supply of a 450 MW three-casing condensing steam turbine and associated equipment, including installation supervision and commissioning.
Hydropower
Excitation regulator refurbishment at Liptovská Mara, Považská Bystrica, Ladce, Velké Kozmálovce and Domaša hydropower plants
06/2021 – 12/2023
- Owner
- Slovenské elektrárne, a.s.
- Supplier
- ZAT a.s.
- Period of involvement
- 06/2021 – 12/2023
- Role
- Project Manager / Lead Project Engineer
Supply of eleven excitation systems for five hydropower plants, including engineering and manufacturing documentation, manufacture, installation and commissioning.
Turbine governor modernisation at Mikšová Hydropower Plant, TG1–3
06/2023 – present
- Owner
- Slovenské elektrárne, a.s.
- Supplier
- ZAT a.s.
- Period of involvement
- 06/2023 – present
- Role
- Project Manager
Supply of three turbine governors for Mikšová Hydropower Plant, including engineering documentation, manufacture, installation and new cabling.
District heating, industry and other projects
Tábor CHP Plant — boiler K7 and turbine-generator set TG2
2007 – 2008
- Owner
- E.ON
- Supplier
- ČKD PRAHA DIZ
- Period of involvement
- 2007 – 2008
- Role
- Project Recovery Management Following a Boiler Failure
Supply of a fluidised-bed boiler with a steam output of 95 t/h for heat supply, together with 14 MW of cogeneration capacity; management of the boiler supplier and completion of construction.
Construction of boiler K7 and supply of turbine-generator set TG3, Plzeň CHP Plant
2009 – 2010
- Owner
- Plzeň CHP Plant
- Supplier
- ČKD PRAHA DIZ
- Period of involvement
- 2009 – 2010
- Role
- Project Completion Management / Handover for Operation
Construction of a biomass-fired CHP unit with a 30 MWth boiler and a 13 MWe turbogenerator.
Adularya, 2×145 MWe
2010 – 2016
- Owner
- Naksan Holding
- Supplier
- ČKD PRAHA DIZ for Vítkovice
- Period of involvement
- 2010 – 2016
- Role
- Project Manager
Turnkey delivery of the turbine hall for a 2 × 145 MWe power plant, including bid management, contracting, supplier selection and grid synchronisation.
Kladno GT gas-fired peaking plant, 45 MW
2006 – 2007
- Owner
- Atel
- Supplier
- ŠKODA PRAHA
- Period of involvement
- 2006 – 2007
- Role
- Project Recovery Manager / Installation and Start-up Supervisor
Construction of a peaking power plant with a GE LM-6000PD turbine, including project recovery management, performance guarantee testing and unit handover.
New Talkha and El Kureimat, Egypt — 750 MW combined-cycle plants
2006 – 2007
- Owner
- Egyptian Electricity Holding Company
- Supplier
- ŠKODA PRAHA for CMI
- Period of involvement
- 2006 – 2007
- Role
- Construction Coordination
Support and coordination of turbine and generator installation, including project management support and acceptance by the main contractor.
Project development and contracting for the Hyundai Nošovice automotive plant
2007 – 2008
- Owner
- HMMC
- Supplier
- —
- Period of involvement
- 2007 – 2008
- Role
- Bid Lead / Project Development
Construction of production halls and an administration building.
Avion Shopping Park, Ostrava-Jih
2007 – 2011
- Owner
- Inter IKEA Center
- Supplier
- —
- Period of involvement
- 2007 – 2011
- Role
- Bid Lead / Project Development
Construction of a shopping centre.
Electrification of the Ostrava Střed–Kunčice railway line
2005 – 2007
- Owner
- SŽDC
- Supplier
- —
- Period of involvement
- 2005 – 2007
- Role
- Bid Lead / Project Development
Railway line modernisation.
Heat supply from Dětmarovice Power Plant to Bohumín
2010
- Owner
- ČEZ
- Supplier
- —
- Period of involvement
- 2010
- Role
- Bid Lead / Project Development
This CZK 500 million project included an 8 km heat transmission main, 13.5 km of hot-water distribution piping and the replacement of 71 gas-fired boiler houses with 80 heat exchange substations.
PPP business model development — car parks and sports facilities
2011 – 2013
- Owner
- —
- Supplier
- —
- Period of involvement
- 2011 – 2013
- Role
- Project Manager
Assessment of project potential and suitability for multi-storey car parks in Havířov, Český Těšín and Ostrava, ice arenas in Telč and Bystřice, and a leisure complex in Ostrava, including market analysis and development of the contractual model.
JOB Air CHP unit
2018
- Owner
- —
- Supplier
- —
- Period of involvement
- 2018
- Role
- Energy Project Manager
Concept development, project preparation and tendering for delivery under an EC model.
Energy performance contracting project development for Tatra Trucks a.s.
2019
- Owner
- —
- Supplier
- —
- Period of involvement
- 2019
- Role
- Energy Project Manager
Development of an energy-saving project under an energy performance contract.
Energy performance contracting — Vítkovické železniční opravny
2019 – 2023
- Owner
- —
- Supplier
- —
- Period of involvement
- 2019 – 2023
- Role
- Energy Project Manager
Concept development, project preparation and tendering under an energy performance contract with guaranteed savings.
BROSE — carbon neutrality
2020 – 2023
- Owner
- —
- Supplier
- —
- Period of involvement
- 2020 – 2023
- Role
- Energy Project Manager
Concept development, project preparation and engineering for a carbon neutrality project using energy performance contracting, power purchase agreements and other measures.
Wheel workshop heating — Vítkovické železniční opravny
2021
- Owner
- —
- Supplier
- —
- Period of involvement
- 2021
- Role
- Energy Project Manager
Heating system modernisation — concept development, project preparation and delivery.
Improving the energy performance of DRFG properties
2022
- Owner
- —
- Supplier
- —
- Period of involvement
- 2022
- Role
- Energy Project Manager
Optimisation proposals for 52 shopping centres to reduce non-renewable primary energy consumption, preparation of building energy performance certificates and development of an investment plan.
SPV sorting line project
2023
- Owner
- —
- Supplier
- —
- Period of involvement
- 2023
- Role
- Energy Project Manager
Process design for a light-fraction secondary sorting system.
Feasibility study — VR/AR in industrial environments
01/2022 – 01/2023
- Owner
- ELVAC, Wienerberger, MyCom, Doosan Škoda Power, ÚJV Řež/CVŘ and others
- Supplier
- PTC, RealWear, MS, TeamViewer
- Period of involvement
- 01/2022 – 01/2023
- Role
- Project Manager
Assessment of the client's processes, identification of opportunities for improvement using augmented reality, and evaluation of implementation requirements and return on investment, including a digital twin.
Let's work together